翻訳と辞書
Words near each other
・ Dubeczno
・ Dubedou
・ Dubee
・ Dubei Township
・ Dubek
・ Dubenec
・ Dubenec (Příbram District)
・ Dubenec (Trutnov District)
・ Dubeninki
・ Dubenki
・ Dubensky
・ Dubensky (inhabited locality)
・ Dubensky District
・ Dubensky District, Russia
・ Dubensky District, Tula Oblast
Duber Khwar Hydroelectric Plant
・ Duberdicus
・ Duberman
・ Duberria lutrix
・ Duberty Aráoz
・ Dubeshk
・ Dubey
・ Dubey Schaldenbrand
・ Dubeyiella
・ Dubeys' immigration to Sambalpur
・ Dubeč
・ Dubfire
・ Dubford
・ Dubford, Aberdeen
・ Dubgaill and Finngaill


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Duber Khwar Hydroelectric Plant : ウィキペディア英語版
Duber Khwar Hydroelectric Plant

Duber Khwar Hydropower Plant is located near the town of Pattan in Kohistan, Khyber Pakhtunkhwa, Pakistan on the Duber Khwar River, a right bank tributary of Indus River. It is approximately 300 km NW from Islamabad, the federal capital of Islamic Republic of Pakistan.〔http://www.wapda.gov.pk/htmls/duberkpj.html〕
The total electricity generation capacity of the Duber Khwar Project is 130 MW.〔http://www.wapda.gov.pk/htmls/duberkpj.html〕 There are two vertical Pelton wheel turbine units of 65 MW each installed at Duber Khwar Hydroelectric Station. These turbines are manufactured by Andritz Hydro Austria.〔http://www.hydroworld.com/articles/2014/01/first-unit-at-pakistan-s-130-mw-duber-khwar-hydroelectric-plant-generating-power.html〕 Andritz Hydro Austria has supplied and installed the complete electro-mechanical equipment and services with the focus on its "water to wire" concept. The supplies consisted of two 65 MW Pelton-type turbines with a rated head of 516 m, associated generators and generator auxiliaries and the complete electrical power systems.〔http://www.nation.com.pk/business/04-Jan-2014/30mw-duber-khwar-hydropower-project-starts-test-production〕
Construction of Duber Khwar Hydropower Plant was commenced in June 2003 and the project was completed in June 2013. The plant began commercial operation in January 2014.〔(【引用サイトリンク】title=First unit at Pakistan's 130-MW Duber Khwar hydroelectric plant generating power )〕 The total cost of the project is about PKR 16.325 billion. Prime Minister Nawaz Sharif is likely to inaugurate the Duber Khwar hydropower project soon. Environment-friendly Duber Khwar hydropower project will generate 595 million units of low-cost hydel electricity per annum.〔http://www.thenews.com.pk/Todays-News-3-235461-Duber-Khwar-hydropower-project-completed〕
==Dam==
Type: Concrete gravity dam
Length: 202 m.
Height: 40.5 m.
Design Discharge: 29 Cusecs
Headrace Tunnel Length: 4.873 km
Design Head: 535 m.〔http://eng.sinohydro.com/index.php?m=content&c=index&a=show&catid=42&id=105〕〔http://www.wapda.gov.pk/htmls/duberkpj.html〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Duber Khwar Hydroelectric Plant」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.